A method of computation for worst-case delay analysis on SpaceWire networks

Author: Thomas Ferrandiz, Christian Fraboul, Fabrice Frances
Publisher: Institute of Electrical and Electronics Engineers (IEEE)

ABOUT BOOK

SpaceWire is a standard for on-board satellite networks chosen by the ESA as the basis for future data-handling architectures. However, network designers need tools to ensure that the network is able to deliver critical messages on time. Current research only seek to determine probabilistic results for end-to-end delays on Wormhole networks like SpaceWire. This does not provide sufficient guarantee for critical traffic. Thus, in this paper, we propose a method to compute an upper-bound on the worst-case end-to-end delay of a packet in a SpaceWire network

Powered by: